Skip to content

Current works

National projects

National projects

The High Speed Electric Train Project (Ain Sokhna Sector) with a length of 3.352 km

Awarding Body ( General Authority for Roads and Bridges )

The High Speed Electric Train Project (Ain Sokhna Sector) with a length of 0.5 km

Awarding Body ( General Authority for Roads and Bridges )

Expansion and development of Wadi El-Natrun El-Alamein Road

Awarding Body ( General Authority for Roads and Bridges )

Ganaklis Desert Road Duplication Project

Awarding Body ( General Authority for Roads and Bridges )

The electric express train project (an alternative road to the quarry road)

Awarding Body ( General Authority for Roads and Bridges )

Al Fardan-Salhiya Road Development and Duplication Project

Awarding Body ( General Authority for Roads and Bridges )

Pauline Aqueduct Road Project

Awarding Body ( General Authority for Roads and Bridges )

Development works of Ain Sukhna port, excavation works, block 5 (A-B)

Awarding Body ( General Authority for Roads and Bridges )

Special projects

Private projects

Roads, crossings, and lighting works in platform A, Road No 2

Awarding Body ( General Authority for Roads and Bridges )

The alternative Rd for quarries Rd with the length of 6.8 km, Al Galala Direction

Awarding Body ( General Authority for Roads and Bridges )

Earthen bridge works for the project of the Monorail train (Ain Sokhna Section) at the distance from 54+500 to 57+852 with a length of 3.352 km

Awarding Body ( General Authority for Roads and Bridges )

Earthen bridge works for the project of the Monorail train (Ain Sokhna Section) at the distance from 7+500 to 8+000 with a length of 0.5km

Awarding Body ( General Authority for Roads and Bridges )

Works of duplication of the remaining distance from the Qanatir Bulin-Kom Hamada Rd, with a length of 10 km

Awarding Body ( General Authority for Roads and Bridges )

Works of duplication of Janaklees desert Rd at the distance from 10 km to 71 km, with a length of 10 km (phase two)

Awarding Body ( General Authority for Roads and Bridges )

Developing and duplicating Elferdan- Elsalheya Rd, with a length of 6.5 km 00+000 to 6+500 (First Phase)

Awarding Body ( General Authority for Roads and Bridges )

Works of digging fiber optic cables route using heavy equipment, installing PVC pipes, cable pulling and installing concrete inspection chambers H.H (First Phase)

Awarding Body ( National Service Projects Organization )

The alternative Rd for quarries Rd with the length of 3.4 km, both directions

Awarding Body ( General Authority for Roads and Bridges )

The alternative Rd for quarries Rd with the length of 6.8 km, Al Suez Direction

Awarding Body ( General Authority for Roads and Bridges )